COUNTRY STATISTIC

# #PEMBUKAAN KELAS TRAINING BARU!!!-> DIBUKA KELAS SETIAP AWAL DAN PERTENGAHAN BULAN 1. AutoCAD (design 2D dan 3D) -> 2. Design 3D mekanikal -> 3. CAM (CNC programer) -> 4. Electrical analysis -> 5. Piping 6. Piping 3D -> 7. Sipil struktur analysis -> 9. 3D arsitektur -> 10. Penjadwalan dan manajemen proyek -> 11. Precom dan Commissioning -> Spesialis Drafter : 1.Piping drafting -> 2.Electrical drafting -> 3.Sipil struktur drafting -> 4.drafting MEP gedung -> #Dapatkan diskon khusus bagi mahasiswa yang telah melakukan training workshop sebelumnya,info Lengkap di www.artec.sch.id CP M.Din 087888021432 #

Authorized Testing Center

TRAINING PAINTING/COATING & INSULATION ENGINEERS


Sistem Painting/Insulation berfungsi untuk memproteksi fasilitas produksi Minyak & Gas dari kerusakan internal maupun ekternal terdapat di anjungan pengeboran minyak. Training Painting/Insulation membahas prinsip-prinsip perancangan sistem painting dan insulation dalam bidang industri oil & gas.
Training ini memberikan pengetahuan dan skill serta materi-materi yang dibutuhkan bagi seorang painting & insulation engineer dalam menjalankan tugasnya di perusahaan Minyak dan Gas serta EPC Company. Didalam training ini dibahas mengenai pengetahuan dasar tentang sistem pengecatan, coating serta insulasi pipa, vessel, Tanki, dan peralatan produksi lainnya. Anda akan dipandu untuk memilih jenis painting/coating serta jenis insulasi/isolasi yang tepat, metode aplikasi serta perhitungan biaya pengecatan serta pembelian material cat dan insulasi/isolasi yang efisien dan Anda dilatih untuk dapat membuat Bill of Quantity serta Material Take Off (MTO) untuk estimasi perhitungan biaya anggaran pada suatu projek MIGAS. Training ini juga memberikan keahlian kepada Anda untuk menjalankan tugas sebagai Coating/Painting Inspector karena didalam modul ini diberikan pengetahuan jenis-jenis kerusakan painting/coating serta metode pengecatan yang paling fektif dan efisien sesuai dengan budget client.

Diharapkan setelah mengikuti training peserta mampu melakukan perancangan sistem painting dan insulation pada sebuah pengeboran minyak/faslitas oil&gas dengan menggunakan code/standard international serta mampu melaksanakan tugas-tugas Painting/Insulation Engineer di sebuah proyek desain pengeboran minyak. Anda dapat memiliki pengetahuan dasar yang kuat serta memiliki ketrampilan dan keahlian seorang professional engineer yang dibutuhkan perusahaan minyak dan gas serta EPC Company yang beroperasi baik di Indonesia maupun di luar negri.


MATERI TRAINING
  • PENGENALAN INDUSTRI MINYAK DAN GAS BUMI DI INDONESIA
o    Sejarah Singkat Exporasi & Exploitasi Minyak & Gas Bumi
o    Profile Cadangan Minyak & Gas Bumi
o    Pertamina - BP Migas Production Sharing Contractors
·         INTRODUCTION OF PAINTING/INSULATION ENGINEER
    • Role & Responsibilities
    • Work Plan & official Document
    • Department & Activities
·         OIL & GAS PRODUCTION FACILITIES
    • Gas Processing
    • Oil Processing
    • Paint on Top Side Facilities
    • Insulation on Top Side Facilities
    • Paint/Insulation Material Standard
·         PAINTING/COATING
    • Paint/Coating Definition
    • Coating Classification
    • Paint Composition
    • Paint Function
    • Paint Layers
    • Non-Metallic Paint/Coating
    • Paint System & Drying
    • Paint System Resistance
    • Metallic Paint/Coating (TSA, Galvanized, Cr-Ni Plating)
·         INSULATION
    • Insulation Definition
    • Insulation Type
    • Insulation function
    • Insulation Material
    • Insulation Properties
    • Insulation Protective
·         PAINT THICKNESS CALCULATION
    • WFT Thickness
    • DFT Thickness
    • Theoretical Spreading Rate
    • Paint Consumption
    • Dead Loss Calculation
·         INSULATION THICKNESS CALCULATION
    • Insulation Thickness Formula
    • Insulation Thickness Chart
    • Insulation Thickness Table

·         PAINT APPLICATION
    • Good Application Requirement
    • Steel Substrate
    • Paint Bonding
    • Surface Preparation
    • Abrasive Media
    • Surface Profile
    • Degree of Cleanness
    • Roughness
·         PAINT INSPECTION
    • Pre Paint Inspection
    • Paint Inspection
    • Post Paint Inspection
·         PAINT/COATING FAILURES
    • List of Coating Failures
    • Degradation of Binder Document
    • Coating Failure Inspection Workflow
    • P&ID and Line Designation Table References
·         PROJECT SPECIFICATION
    • Painting Specification – Banyu Urip Project
    • Insulation Specification – Banyu Urip Project
·         PAINTING/INSULATION PROCEDURE
    • Painting System Table
    • Insulation Application Procedure
    • Painting Application Procedure
    • Piping Service Identification Color
    • Inspection Report
·         PAINTING/INSULATION WORK VOLUME
    • Painting/Insulation Work Volume

·         PAINTING/INSULATION MATERIAL TAKE OFF (MTO)
    • Painting/Insulation MTO

·         PAINTING/INSULATION RECQUISITION

·         SPREAD SHEET APPLICATION

·         FINAL PROJECT

Biaya : 4.500.000